The following list provides an outline of the process of converting a single-instance database to an Oracle RAC database using Oracle Enterprise Manager Grid Control:
Complete the prerequisite tasks for converting to an Oracle RAC database:
Oracle Clusterware and Oracle Database software is installed on all target nodes.
Oracle Clusterware is started.
The Oracle Database binary is enabled for Oracle RAC on all target nodes.
Shared storage is configured and accessible from all nodes.
User equivalency is configured for the operating system user performing the conversion.
Enterprise Manager agents are configured and running on all nodes, and are configured with the cluster and host information.
The database being converted has been backed up successfully.
Access the Database Home page for the database you want to convert.
Go to the Server subpage and select Convert to Cluster Database.
Provide the necessary credentials.
Select the host nodes that will contain instances of the new database.
Provide listener and instance configuration information.
Specify the location of the shared storage to be used for the data files.
Submit the job.
Complete the post-conversion tasks.
The resulting Oracle RAC database uses a server pool instead of a fixed configuration.